Stanchioned flat for forestry traffic. Stanchions fold to allow side loading by grapple.

Specification

Tare
22 t
Payload
68 t
Gross on rail
90 t
Axle load
22.5 t
Axles
4
Over buffers
19.9 m
Loading length
18.7 m
Deck height
1200 mm
Max speed
100 km/h
Carries
round timbersawn timberpoles
Loaded by
craneside

How many fit in a train

The binding limit is usually the shortest passing loop on the route, not the locomotive.

European norm
27 wagons
550 m train · 1836 t payload
TEN-T corridor
37 wagons
740 m train · 2516 t payload
Extended
41 wagons
835 m train · 2788 t payload

Worked example.1360 t needs 20 × Slps, which is 74% of a 550 m train (27 wagons). That is enough to justify running a block train: it goes origin to destination without being marshalled, so it avoids the 1–4 days of yard dwell wagonload adds, and the per-tonne rate is lower because the path and traction are spread over a full train.

Loading gauge clearance

Whether a load clears the tunnels and bridges, on this wagon's 1200 mm deck. This is not track gauge — see the track gauge checker for whether the wheels can run on a given network.

LoadW6A
3965
W8
3965
W10
4020
W12
4020
GA
4280
GB
4320
GB1
4320
GC
4650
1-T
5300
plate-c
4724
plate-f
5182
plate-h
6147
sa-cape
3965
dfc
7100
40ft standard (8'6")
3791 mm total
✓+174 ✓+174 ✓+229 ✓+229 ✓+489 ✓+529 ✓+529 ✓+859 ✓+1509 ✓+933 ✓+1391 ✓+2356 ✓+174 ✓+3309
High-cube (9'6")
4096 mm total
✗-131 ✗-131 ✗-76 ✗-76 ✓+184 ✓+224 ✓+224 ✓+554 ✓+1204 ✓+628 ✓+1086 ✓+2051 ✗-131 ✓+3004
Swap body
3870 mm total
✓+95 ✓+95 ✓+150 ✓+150 ✓+410 ✓+450 ✓+450 ✓+780 ✓+1430 ✓+854 ✓+1312 ✓+2277 ✓+95 ✓+3230
P400 semi-trailer
5200 mm total
✗-1235 ✗-1235 ✗-1180 ✗-1180 ✗-920 ✗-880 ✗-880 ✗-550 ✓+100 ✗-476 ✗-18 ✓+947 ✗-1235 ✓+1900

Margins in millimetres. A load clearing by less than 50 mm needs the operator to confirm the specific path before booking.